All Star CR 03 25 On-Board Gasket (.250 in Wide x 1/32 in Thick)

★★★★★
Iron Line Verified
Authorized Dealer: All Star CNC
Official Partner
IN STOCK & READY TO SHIP
SKU: CR 03 25

Price:
Sale price$28.59
Financing as low as ~$0 / month (60 mo. terms) Estimate your payment
×

We pay your sales tax! (IL excluded) 📦 

  • Surface-mounted: Adhesive on one side for quick set-up of spoilboard fixtures.
  • Vacuum clamp on MDF: A fast way to build a strong vacuum clamp on an existing MDF spoilboard by adding a gasketed pocket under the parts, rather than relying on downdraft through the MDF.
  • Size: .250 in wide x 1/32 in thick, Medium Density.
  • Roll length: 200 ft per roll.
  • Thickness use: The 1/32 in thickness suits plastics.
  • Pack options: Buy a single roll or a case of 18 rolls, which carries a 15% saving versus buying singles.

Estimated Delivery Timeline

Order Placed

Ships Out

Delivered

*Please Note: This timeline is an estimate. Certain products may require an additional 1 week for manufacturing. Please speak with your sales rep, Matthew, for official details and confirmation before placing your order.

CALL US FOR THE MOST ACCURATE AND COMPETITIVE LTL SHIPPING RATE, (888) 308-5580

Get Questions Answered Fast

Experience: 20+ Years B2B • Origin: US-Based Support
EXPRESS SHIPPING

EXPRESS SHIPPING

Most orders process in 1-3 days. Yes, even if it weights 400lb

Hassle-Free Returns

Hassle-Free Returns

No restocking fees. Ever.

Manufacturer Warranty

Manufacturer Warranty

Fully backed by the brands you trust.

Dedicated Rep Mathew

Dedicated Rep Mathew

Speak to a US-Based Equipment Specialist: (888) 308-5580

Flexible Financing

Flexible Financing

Get Upto 60 Months Financing

Key Information

  • Order Cutoff Time: 2:00 PM EST
  • Order Handling Time: 1–3 business days (Monday–Friday)
  • Transit Time: 1–7 business days (Monday–Friday)
  • Total Estimated Delivery Time: 3–11 business days (Monday–Friday)
  • Shipping Availability: Free Shipping On some Items In The Contiguous United States only

    For more information Click Here
×

Engineering Toolsuite

Industrial calculations for facility planning and financial justification.

1. Facility & Utility Sizing

Airflow, thermal load, and suction requirements.

→

2. Safety & OSHA Compliance

Noise limits, combustible dust, and shop layout safety.

→

3. CAPEX & Strategic Analysis

Section 179, Labor ROI, and downtime revenue loss.

→

Facility & Utility Sizing

Airflow Sizer (CFM)

Calculate ventilation for cooling and air quality.

Dehumidification (PPD)

Determine moisture removal for curing or climate control.

Dust Collection (CFM)

Required suction for material extraction.

Machine Thermal Load

Size cooling based on machine BTU output.

Safety & OSHA Compliance

OSHA Noise Exposure

Calculate daily noise dose and legal limits.

Combustible Velocity

Required FPM to move materials safely through ducting.

Heat Stress Index

Workplace danger zones based on heat and humidity.

Safe Machine Spacing

Physical footprint including material handling clearance.

CAPEX & Strategic Analysis

Section 179 Savings

Immediate tax deduction for equipment purchase.

Cost of Inaction

Revenue bleed from legacy equipment downtime.

Labor ROI (Payback)

Months until machine labor savings covers the cost.

Material Waste Savings

Monthly profit increase from scrap reduction.

Airflow Sizer

Recommended Airflow:

0 CFM

Dehumidification

Moisture Removal:

0 PPD

Dust Collection

Min. Suction Needed:

0 CFM

Machine Thermal Load

Heat Output:

0 BTU/hr

Cooling: 0 Tons

OSHA Noise Dose

Daily OSHA Dose:

0%

Duct Velocity

Required Volume:

0 CFM

Heat Stress Index

Feels Like:

0 °F

Safe Footprint

Safe Shop Area:

0 Sq Ft

Section 179 Savings

Tax Savings:

$0

Net Cost: $0

Cost of Inaction

Monthly Loss:

$0

Labor ROI

Payback Period:

0 Months

Waste Reduction

Monthly Savings:

$0

Request Expert Consultation

Our tool specialists are ready to help you find the perfect solution for your specific application.

CAPITAL ACCESS

EQUIPMENT FINANCING

AVAILABLE

Preserve cash flow with up to 60 month financing.

Job Site Proven

Trusted by Facilities and manufacturing centers

Frequently Asked Questions for All Star CNC
Yes, the CR 03 25 On-Board Gasket is surface-mounted and includes adhesive on one side for direct application to spoilboard fixtures.
Its 1/32 in thin profile is best suited to plastics.
Applying CR 03 25 to an existing MDF spoilboard adds a gasketed pocket under the part, building a strong vacuum clamp rather than relying on downdraft through the MDF alone.
A single roll of CR 03 25 contains 200 ft of gasket.
The CR series on-board gasket is a Medium Density option in the All Star CNC gasket lineup.
Yes, case pricing is available for CR 03 25 as an 18-roll case, offering a 15% savings versus buying single rolls.

Recently viewed

Field Reports

All Star CR 03 25 On-Board Gasket (.250 in Wide x 1/32 in Thick) Reviews